What's the difference between a building and a pest inspection?
A building inspection assesses the condition and structure of a property, while a pest inspection focuses on termites and other timber pests. A combined building and pest inspection covers both in one visit.
How long does an inspection take?
Most residential inspections take one to two hours on site, depending on the size and accessibility of the property. Your written report typically follows shortly after.
When should I book a pre-purchase inspection?
Book as early as possible once you're seriously considering a property — ideally before auction or before finalising an offer — so you have time to act on the findings.
What does a building inspection cover?
A building inspection is a visual assessment of the reasonably accessible parts of a property, carried out to AS 4349.1. That typically means the interior, the exterior, the roof space, the subfloor and the site — including paths, drainage, retaining walls and outbuildings where relevant. The inspector reports on the condition of these areas, noting safety hazards, major and minor defects, and general maintenance items. It is a condition report rather than a certificate of compliance, and areas that could not be safely accessed on the day are recorded so the scope of what was examined is clear.
Does a building inspection include the roof?
Where it can be accessed safely, yes. The inspector examines the roof covering, gutters and, where there is safe entry, the roof space above the ceiling, looking at framing, sarking and signs of leaks. Steeply pitched, very high or structurally unsafe roofs may only be viewed from ground level or a ladder. Anything that could not be accessed on the day is recorded in the report by name, so you know exactly what was and wasn't reached rather than being left with an unstated gap.
Can I attend a building inspection?
You're welcome to. Many buyers come for the final part, when the inspector can walk them through what was found and point at it in person. Attending is optional and doesn't change the written report, but standing in the subfloor or roof space while an issue is explained often makes it far clearer than reading about it later. If you can't make it, the report and a follow-up conversation cover the same ground.
What will the building report contain?
A pre-purchase building report prepared to AS 4349.1 describes the property, lists the areas inspected, and records defects by significance — from safety hazards and major defects through to minor items and general maintenance. Expect plain-English descriptions, photographs of the findings, and notes on any areas that could not be accessed. It is a condition report on what was visible on the day, not a certificate of compliance or a costing document, though it gives you the detail needed to seek quotes.
Can hidden defects still exist after a building inspection?
Yes. A building inspection is a visual assessment of accessible areas, so faults concealed inside walls, under floor coverings, or behind stored items may not be visible on the day. Inspectors do not perform destructive investigation such as lifting floorboards or cutting into linings. This is a recognised limitation of any standard inspection, which is why the report notes where access was restricted. If a particular area is a concern, further specialist or invasive investigation can be arranged separately.
Is a building inspection completed to Australian Standards?
A pre-purchase residential building inspection is carried out in line with AS 4349.1, the standard that sets out the scope of a property condition report. It defines the inspection as a visual appraisal of reasonably accessible areas and frames how defects are reported. Working to the standard means the scope and its limits are consistent and clearly stated, so you can compare reports on a like-for-like basis rather than relying on an undefined checklist.
When will I receive the building report?
Turnaround varies between inspectors, but a written report commonly follows within about a day of the inspection, and sometimes the same evening. If you are working to an auction or a cooling-off deadline, mention it when booking so the timing can be confirmed in advance. It's worth checking turnaround before you book, particularly in busy periods, so the report arrives while you still have time to act on what it says.
What does a pest inspection detect?
A timber pest inspection, carried out to AS 4349.3, identifies active timber pests such as subterranean termites, along with borers and wood decay fungi where they are present. It looks for evidence of past activity, the damage that results in accessible areas, and the conditions that make a property attractive to pests — things like damp subfloors, poor drainage and timber in contact with the soil. Like any visual inspection it is limited to areas that can be reasonably accessed, so concealed activity may not be visible; any access limitations are recorded in the report.
What pests are checked in a timber pest inspection?
A timber pest inspection focuses on the pests that damage building timbers: subterranean termites, borers (wood-boring insects) and wood decay fungi. It also looks for conditions that attract them, such as damp subfloors, poor drainage, and timber in contact with soil. General household pests like ants, spiders or rodents fall outside the scope unless they signal a conducive condition. The aim is to find timber-destroying organisms and the environments that invite them, rather than to survey every insect on the property.
Can termites always be detected?
No inspection can guarantee every termite is found. A timber pest inspection to AS 4349.3 is a visual check of accessible areas, and termites can remain hidden inside walls or under finishes with no surface evidence on the day. Inspectors use moisture meters and sounding to improve detection, since damp and hollow timber are strong indicators, but concealed activity behind solid surfaces can go unseen. The report records areas that could not be accessed, and further investigation can be arranged where there is reason for concern.
Does a pest inspection include roof voids?
Where there is safe and reasonable access, the roof void is inspected, as it is a common place to find termite workings, damaged timbers and moisture entry. The inspector also checks the subfloor, interior, exterior and the garden where relevant, since termites often approach from fences, stumps or garden beds. Confined, unsafe or sealed roof spaces may not be fully accessible; any such limitation is noted in the report so you know which areas were and were not examined.
Can previous termite damage be identified?
Often, yes. Inspectors look for signs of past activity such as mud tunnelling, damaged or hollowed timber, and old workings, and will report these alongside any live activity. However, distinguishing old damage from current activity, and judging its full extent, can be difficult when it is concealed within a structure. The report describes what is visible and may recommend further investigation where the significance of past damage cannot be established by visual inspection alone.
Is treatment included in a pest inspection?
No. An inspection and a treatment are separate things. A timber pest inspection is an independent assessment that reports on what was found; it does not include spraying, baiting or termite management work. Keeping them separate matters, because an inspector who has no stake in selling a treatment can report objectively. If active termites or a conducive situation are found, the report will note them and you can then engage a licensed pest manager to advise on and carry out any treatment.
How often should a pest inspection be completed?
For occupied homes, a common recommendation is a timber pest inspection at least once a year, and more frequently in areas of higher termite pressure. Termites can establish and cause significant damage between inspections, so regular checks help catch activity early. Annual inspections are separate from the one you would obtain before buying a property. Your inspector can suggest a sensible interval based on the construction type, the surrounding environment and any history of activity at the property.
Why combine a building and pest inspection?
Buying a home involves two distinct risks — structural condition and timber pests — and they often overlap. Damp that concerns a building inspector is also what attracts termites, so assessing both together gives a fuller picture of the property. A combined inspection covers the building to AS 4349.1 and timber pests to AS 4349.3 in a single visit, so you aren't left weighing one report without the context of the other when deciding whether to proceed.
Is a combined inspection more cost-effective than booking separately?
Booking both together is usually more convenient and often better value than arranging two separate visits, since it involves one attendance and one coordinated report. More importantly, it removes gaps: a single inspector considering both structure and pests can connect related findings, such as a leaking wet area and nearby termite-conducive moisture. Pricing varies between providers and with the size and age of the property, so it's worth confirming what a combined inspection includes when you book rather than assuming scope.
Will I receive one report or two?
Practice varies. Some inspectors provide a single combined document with clearly separated building and pest sections, while others issue two reports from the one visit. Either way, the building component is prepared to AS 4349.1 and the pest component to AS 4349.3, and each has its own defined scope. What matters is that both areas are covered and the findings are clearly set out. If you have a preference, ask when booking so the format is confirmed before the inspection goes ahead.
What happens if termites are discovered during a combined inspection?
If live termites or evidence of activity are found, the report records the location, the nature of the findings and any resulting damage in accessible areas, along with conducive conditions. It won't include treatment — that is a separate service by a licensed pest manager — but it gives you the detail to seek advice and quotes. Finding termites doesn't automatically mean walking away; it means you can make an informed decision, factor the issue into negotiations, or arrange further investigation of concealed areas.
Does the building inspection affect the pest inspection?
They inform one another. Building and pest issues frequently share a root cause, most often moisture: poor subfloor ventilation, drainage faults or leaking wet areas show up as building defects and, at the same time, create the damp conditions timber pests seek out. Assessing both together lets the inspector connect these findings rather than treating them in isolation. That said, each component still follows its own standard and scope, so the two assessments remain distinct even when their findings are related.
How long does a combined building and pest inspection take?
A combined inspection generally takes a little longer than a single one — commonly around one and a half to two and a half hours on site for a typical house, and longer for large, old or hard-to-access properties. The inspector works methodically through the interior, exterior, roof space, subfloor and grounds for both building and pest purposes. Deep subfloors and complex sites add time. Confirming the likely duration when booking helps if you plan to attend the walkthrough at the end.
What should I do after receiving a combined report?
Read it in full, including the sections on areas that could not be accessed, then discuss any major findings with the inspector so you understand their significance. From there you generally have three options: proceed, renegotiate on the basis of the defects, or, if the issues are serious enough, reconsider the purchase. It's also wise to give the report to your conveyancer or solicitor, who acts for you and can advise on how the findings bear on the contract.
Should I inspect before making an offer?
Where you can, inspecting before you make an offer puts you in the strongest position, because you go in already knowing the property's condition. It's especially valuable for a private-sale purchase, where the findings can shape both your price and your contract conditions. When timing is tight, some buyers make an offer subject to a satisfactory inspection instead. Your conveyancer can advise on how to word that so you retain the ability to act on what the report finds.
Can I get a pre-purchase inspection before an auction?
Yes, and it's strongly worth doing. There is no cooling-off period when you buy at a publicly advertised auction in Victoria, so once the hammer falls the property is yours, defects included. That makes a pre-auction inspection the only practical chance to understand the condition before you commit. Because access must be arranged with the agent and the report prepared in time, it's best to book early in the week before a weekend auction so nothing is rushed.
Can the report help me negotiate the purchase price?
It can give you an evidence-based footing. A report that documents defects with photographs and an assessment of their significance lets you raise specific, substantiated issues rather than vague concerns. In a private sale you may be able to renegotiate the price or seek repairs before settlement. Whether a vendor will move depends on the market and the property, and the report itself makes no promises — but going in with a clear, independent account of the condition is far stronger than relying on impressions.
What happens if serious defects are found?
A serious finding isn't necessarily the end of a purchase — it's information. Depending on how you've bought, options may include renegotiating the price, asking the vendor to rectify the issue, seeking specialist quotes to understand the cost, or deciding the property isn't right for you. Because a report only reflects what was visible, a major defect sometimes warrants further investigation of concealed areas before you decide. Discussing the finding with your inspector and your conveyancer helps you weigh it properly.
How quickly can a pre-purchase inspection be arranged?
It depends on access and demand, but inspections can often be arranged within a few days, and sometimes sooner when a deadline requires it. The main variables are coordinating entry with the vendor's agent and the inspector's availability, which can tighten in busy selling periods. If you're working towards an auction or the end of a cooling-off period, say so when booking so the timing can be confirmed and the report delivered while you still have room to act.
Is the report suitable for finance or insurance discussions?
A pre-purchase inspection report is prepared to inform your buying decision; it is a condition assessment, not a bank valuation or an insurance certificate. Lenders rely on their own valuation process and insurers on their own criteria, so the report is not a substitute for either. That said, the detail it contains can be useful background when you discuss a property's condition. If a lender or insurer needs a specific document, it's best to confirm their exact requirement directly.
What should I do after receiving the report?
Start by reading it in full, including any noted access limitations, and follow up with the inspector on anything unclear or significant. Then decide how it shapes your next step — proceeding, renegotiating, arranging further investigation, or walking away. Sharing the report with your conveyancer or solicitor is sensible, since they act for you and can advise how the findings interact with the contract and any conditions. Acting while you still have time is the point of booking early.
Why inspect a brand-new home?
New doesn't automatically mean fault-free. Even well-built homes can leave the builder with incomplete work or defects — poor tiling and waterproofing, gaps and finishing faults, drainage issues or items simply not finished. An independent inspection gives you an objective account of the work before you accept it, rather than relying on a final walkthrough alone. Identifying issues while the builder is still contractually engaged, and before you take possession, is far easier than pursuing them afterwards.
What is a practical completion (handover) inspection?
A practical completion inspection, sometimes called a handover or PCI inspection, is carried out near the end of a new build when the builder considers the home essentially finished. An independent inspector checks the completed work for defects and incomplete items and records them in a report you can provide to the builder. It's timed so that issues are captured before you take handover and make final payment, which is generally the most practical point to have the builder's outstanding work addressed.
What defects are commonly found in new homes?
Frequently reported items include incomplete or poor waterproofing to wet areas, tiling and grout faults, gaps and finishing defects in paint, plaster and joinery, doors and windows that don't operate properly, drainage and site grading problems, and general items left unfinished. Many are workmanship or finishing issues rather than structural faults, but they are easier to have corrected before handover. A thorough inspection lists them clearly so nothing relies on being spotted later once you've moved in.
Can builders be required to rectify defects?
Typically a building contract requires the builder to complete the work to an appropriate standard and to address legitimate defects, and domestic building law in Victoria provides further protections. An inspection report gives you a clear, itemised list to raise with the builder before handover. Whether a particular item must be rectified depends on your contract, the relevant standards and the nature of the issue, so a report that documents findings objectively is a practical starting point for that conversation rather than the final word.
When should a new-home inspection take place?
The key point is practical completion, once the builder regards the home as finished but before you take handover and make final payment — that timing gives the best opportunity to have defects addressed. Buyers building from scratch often also arrange stage inspections during construction, at points like the frame and lock-up stages, so work is checked before it's covered up. Booking a little ahead of your expected completion date helps ensure the inspection fits your handover timeline.
Can I delay handover if major defects are identified?
Your rights around handover and final payment are governed by your building contract and the applicable legislation, not by the inspection itself. An inspection report supports the conversation by setting out defects objectively, but whether you can withhold handover or payment over a particular issue is a contractual and legal question. For significant defects it's wise to seek advice from your conveyancer or solicitor on your specific contract before acting, so any step you take is on solid footing.
What standards are used, and will I receive photos and recommendations?
New-home and handover inspections are commonly assessed against the National Construction Code, the relevant Australian Standards and the accepted tolerances for building work, such as the industry guide to standards and tolerances. The report should set out each item clearly, generally with photographs, and note what needs attention so you can raise it with the builder. It documents the condition and outstanding work rather than certifying compliance, giving you an itemised basis for the builder to complete or correct the work.
What is a construction stage inspection?
A construction stage inspection checks a new build at defined points as it goes up, rather than only at the end. An independent inspector attends at key stages and reports on the work completed to that point, so problems can be identified before they are concealed by later work. It complements the final handover inspection: staged checks catch issues early in the sequence, while the handover inspection addresses completion and finishing once the home is essentially finished.
Which construction stages are usually inspected?
Inspections commonly align with the standard progress stages of a domestic build: base or slab, frame, lock-up (once the home is watertight and external walls and roof are on), and fixing or completion. Each stage is a natural checkpoint where particular elements are visible before the next phase covers them. Not every project needs every stage inspected; the frame and lock-up stages are especially valuable because much of that work becomes hidden once linings and cladding go on.
Why inspect during construction rather than only at the end?
Much of a building's structure is progressively concealed — footings are covered, framing is lined, and services are built in. Once that happens, checking the work means opening it back up, which is disruptive and rarely done. Inspecting at each stage lets an independent set of eyes assess elements while they are still visible, so any concerns are raised at the point they can be addressed most easily. It's about timing the check to when the work can actually be seen.
What happens at a frame stage inspection?
At frame stage the home's skeleton is up but not yet lined, so the framing, bracing, tie-downs, and the layout of openings are visible, along with early service rough-ins. An inspector reviews this work against the approved plans and the relevant standards and records anything that appears not to comply or to need attention. Because the frame is soon covered by insulation and plaster, this stage is one of the most useful to inspect while everything remains open to view.
What standards apply to construction stage inspections?
Building work in Australia is assessed against the National Construction Code, the referenced Australian Standards for the relevant trades, and the accepted tolerances for domestic construction, alongside your approved plans and specifications. A stage inspection considers whether the work completed to that point is consistent with these. The report describes what was observed and any items that appear to warrant attention; it documents the work rather than issuing the statutory approvals, which remain the responsibility of the appointed building surveyor.
How is this different from the building surveyor's inspection?
The building surveyor carries out mandatory inspections and issues the statutory approvals required for the build to progress and ultimately to be occupied. An independent construction stage inspection is a separate, optional check commissioned by the owner, looking at the quality and completeness of the work in your interest. The two are complementary: the surveyor's role is regulatory, while your inspector's role is to give you an additional, owner-focused account of how the work is being carried out.
What will a construction stage report include?
A stage report identifies the stage inspected, describes the work observed, and lists any items that appear defective, incomplete or inconsistent with the plans or standards, generally supported by photographs. It's written so you can raise the items with your builder at the right moment in the schedule. Like other inspections it assesses what is visible and accessible at that stage rather than certifying the work, giving you a clear, itemised basis to have concerns addressed before construction moves on.