New Home Inspection
Confidence at handover on your brand-new home.
A pre-handover inspection of a newly built home to identify defects and incomplete work before final acceptance, so issues are fixed by the builder rather than by you.
- Independent Reports
- Australian Standards
- Fast Reports
What's included
Pre-handover defect check
Workmanship and finish review
Builder-actionable item list
Questions about this inspection
Why inspect a brand-new home?
New doesn't automatically mean fault-free. Even well-built homes can leave the builder with incomplete work or defects — poor tiling and waterproofing, gaps and finishing faults, drainage issues or items simply not finished. An independent inspection gives you an objective account of the work before you accept it, rather than relying on a final walkthrough alone. Identifying issues while the builder is still contractually engaged, and before you take possession, is far easier than pursuing them afterwards.
What is a practical completion (handover) inspection?
A practical completion inspection, sometimes called a handover or PCI inspection, is carried out near the end of a new build when the builder considers the home essentially finished. An independent inspector checks the completed work for defects and incomplete items and records them in a report you can provide to the builder. It's timed so that issues are captured before you take handover and make final payment, which is generally the most practical point to have the builder's outstanding work addressed.
What defects are commonly found in new homes?
Frequently reported items include incomplete or poor waterproofing to wet areas, tiling and grout faults, gaps and finishing defects in paint, plaster and joinery, doors and windows that don't operate properly, drainage and site grading problems, and general items left unfinished. Many are workmanship or finishing issues rather than structural faults, but they are easier to have corrected before handover. A thorough inspection lists them clearly so nothing relies on being spotted later once you've moved in.
Can builders be required to rectify defects?
Typically a building contract requires the builder to complete the work to an appropriate standard and to address legitimate defects, and domestic building law in Victoria provides further protections. An inspection report gives you a clear, itemised list to raise with the builder before handover. Whether a particular item must be rectified depends on your contract, the relevant standards and the nature of the issue, so a report that documents findings objectively is a practical starting point for that conversation rather than the final word.
When should a new-home inspection take place?
The key point is practical completion, once the builder regards the home as finished but before you take handover and make final payment — that timing gives the best opportunity to have defects addressed. Buyers building from scratch often also arrange stage inspections during construction, at points like the frame and lock-up stages, so work is checked before it's covered up. Booking a little ahead of your expected completion date helps ensure the inspection fits your handover timeline.
Can I delay handover if major defects are identified?
Your rights around handover and final payment are governed by your building contract and the applicable legislation, not by the inspection itself. An inspection report supports the conversation by setting out defects objectively, but whether you can withhold handover or payment over a particular issue is a contractual and legal question. For significant defects it's wise to seek advice from your conveyancer or solicitor on your specific contract before acting, so any step you take is on solid footing.
What standards are used, and will I receive photos and recommendations?
New-home and handover inspections are commonly assessed against the National Construction Code, the relevant Australian Standards and the accepted tolerances for building work, such as the industry guide to standards and tolerances. The report should set out each item clearly, generally with photographs, and note what needs attention so you can raise it with the builder. It documents the condition and outstanding work rather than certifying compliance, giving you an itemised basis for the builder to complete or correct the work.